Wednesday, April 29, 2015

Kitchen Remodel Wiring

Here is the plan: 1. 48" stove dedicated on 50amp/240v 2. 48" fridge (10amps) and 3 outlets (pantry room) on 15amp 3. 48" hood (9amps) and 8 inside cabinets lights (puck) on 15amp 4. dishwasher (1300w, 12amps) dedicated on 15amp 5. main sink disposal (7amps) dedicated on 15amp 6. under cabinet microwave on island (1000w,14.5aamps) dedicated on 20amp 7. island sink disposal (7amps) and 4-5 GFCI (on island) outlets on 15amp 8. under cabinet lights (13 ft of rope light @12.2w/3.3ft) and recessed lights (12 led - 12w each) on 20amp

No comments:

Post a Comment