Hello,
We have jack hammered, and grinded re-bar out to remove a jacuzzi we did not want on our patio. We can see the existing slab that is was built on, but the bottom of the jacuzzi got filled with rubble as we demo'ed the parts above ground level. We want to fill in this hole and fill in the frame of the existing slab so we can lay some slate tile to match the rest of our patio. Since all of the damage is below the top level of the slab, can we simply pour concrete over the rubble to fill in the holes make the slab level again?
We have jack hammered, and grinded re-bar out to remove a jacuzzi we did not want on our patio. We can see the existing slab that is was built on, but the bottom of the jacuzzi got filled with rubble as we demo'ed the parts above ground level. We want to fill in this hole and fill in the frame of the existing slab so we can lay some slate tile to match the rest of our patio. Since all of the damage is below the top level of the slab, can we simply pour concrete over the rubble to fill in the holes make the slab level again?
No comments:
Post a Comment