Hi all,
First post, glad I found this site.
I am cutting out the back of my garage and building it barn door style, so I have access to my garage from front and back. My AC unit is a ground unit, the wiring seems easy, the lower part of the harness I figure just go to a home store and get a longer one? Of course turning off the power first.
Then I need to move over the PVC tubes, fairly easy, not sure what these are called, I think they are for the condensation that builds up?
What Im unsure about, is there are 2 copper tubes, one small and one medium size . Are these pressurized? I supposed I'd need some new copper tubing and some "L" elbows? As of now Im not sure where to detach or cut them, Im not touching anything yet....
Any advice would be great. Im hardly moving it btw, mostly just turning it Im trying to gain only about 10" of clearance.
First post, glad I found this site.
I am cutting out the back of my garage and building it barn door style, so I have access to my garage from front and back. My AC unit is a ground unit, the wiring seems easy, the lower part of the harness I figure just go to a home store and get a longer one? Of course turning off the power first.
Then I need to move over the PVC tubes, fairly easy, not sure what these are called, I think they are for the condensation that builds up?
What Im unsure about, is there are 2 copper tubes, one small and one medium size . Are these pressurized? I supposed I'd need some new copper tubing and some "L" elbows? As of now Im not sure where to detach or cut them, Im not touching anything yet....
Any advice would be great. Im hardly moving it btw, mostly just turning it Im trying to gain only about 10" of clearance.
No comments:
Post a Comment